Group | Title | Authors |
A3 | Innovative T&D Switching Equipment and Development of its Testing Technology | R.P.P SMEETS, A.B. HOFSTEE, R.M. NIJMAN, N.A. BELDA, B. BAUM |
B1 | Development HV External Gas Pressure Cable Systems Retrofit | J. VAN ROSSUM, T. KOLTUNOWICZ, A. TSEKMES, R. BARTHOLOMEUS, B. WEGBRANS, J. SMIT, R. ZUIJDERDUIN |
B1 | Statistics, experiences and learnings from failures in power cable systems during pq and type tests, tests after installation and service operation | P. VAN DER WIELEN, H. VAN MAANEN, E. PULTRUM, E. STEENNIS |
B3 | Pre-Qualification Testing of Digital Substations | B. BAUM, M. ACHTERKAMP, T. HEID, M. DUC VO, S. MEIER, C. ZEHNDER, A. VUJANIC, M. YANIN, D. TESSIER, A. LATHOUWERS |
B3 | A Novel Evaluation Method for the Integrity of Grounding Grids in High Voltage Substations Based on Magnetic Field Measurements | M. MISRA, B. BHUYAN, K. VELITSIKAKIS, M. GHAFFARIAN NIASAR, P. VAESSEN |
B3 | A fleet of digital substations at Alliander, a blessing after an intense learning curve | M. VAN RIET, F. BALDINGER |
B3 | TenneT’s giant leap to be able to replace 140 substations within next 10 year, while in service and coming from different lay-outs | A. LATHOUWERS, P. JANSEN, E. DE MEULEMEESTER |
B4 | Towards a deployment plan for a future European offshore grid: cost-benefit analysis of topologies | J. MOORE, J. VAN UDEN, O. ANTOINE, P. HENNEAUX, K. KAROUI, F. RUDOLPH, H. VENNEGEERTS, S. POULLAIN, L. DE VRIES |
B4 | Levelized Energy Cost Improvement through Concept Selection and Availability Optimization for the Norfolk Windfarms’ Export Links | C.A. PLET, M. HOFFMANN, W. EL-KHATIB, A. ALEFRAGKIS, M. KURRAT |
C2 | TSO-DSO Cooperation in a System of Systems | G. DE JONG, M. LALLEMAND |
C2 | New challenges in the evolving Transmission System Operator and Regional Security Coordinator business | DANNY KLAAR, M. NEUBAUER, U. ZIMMERMANN, J.-F. GAHUNGU, J. VAN ROOST, J. MØLLER BIRKEBÆK, T. KAPETANOVIC, R. PAPROCKI |
C2-C6 | Objectives and setup of an aFRR-pilot in the Dutch electricity system | J. FRUNT, J. DREWES |
C3 | Integrating Natural Capital Assessment in the creation of substations Sustainable substation; from dream to reality Case description Substation de Laarberg | J. DEN HARTOG, P. OOSTERHOUT, E. GERRITSE, H. NOOTER, J. VAN DER BEEK |
C4 | Impact of WTG converter impedance model on harmonic amplification factor of the Dutch 110 kV transmission network using a 383 MW wind farm case study | D. VREE, L. BELOQUI LARUMBE, Z. QIN, P. BRAUER, B.C. UMMELS |
C4 | A Parametric Study Towards a Generic Mitigation Against Excessive Circuit Breaker TRVs in Series Reactor Applications in the Netherlands | K. VELITSIKAKIS, J. VAN WAES, I. TANNEMAAT, C. ENGELBRECHT, N. PAPAZACHAROPOULOS |
C4 | Experimental Investigation of Ground Return Currents and Mutual Induction in Extruded Cables | S. NAUTA, P. KROPMAN, F. PROVOOST, M. VAN RIET |
C4 | The comparison of the different methods for the determination of the shielding failure rate of a transmission overhead line | I. TANNEMAAT, K. VELITSIKAKIS |
C5 | Principles for allocation of cross-zonal capacities for the exchange of balancing capacity or sharing of reserves | R. BEUNE, J. DE HAAN, T. HENRI, T. VEITH |
D1 | A new partial discharge measuring system in HVGIS based on magnetic field antennas | A. RODRIGO MOR, F. MUÑOZ- MUÑOZ, L.C. CASTRO-HEREDIA, A. NAYAK |